Put comparable items side by side
Write the supplied door and frame, hardware, labour and finishing work on separate lines. Check whether each quote includes removal, disposal, repairs around the opening or touch-ups after new trim goes in. A blank line may mean someone else is expected to do that work. Ask if the exact unit has been confirmed or is still subject to a site measurement.
Compare who will handle delivery and when work can start. If one proposal assumes that the existing casing or floor stays intact, check whether the other assumes the same. Differences in those assumptions can change the total and how much you need to arrange separately.
- Mark any item that needs inspection before its cost is known.
- Note who is responsible for supplied parts and measurements.
- Circle any allowance that still needs confirmation.
Ask about the remaining differences
Send the same short list of questions to each contractor. Ask what happens if an assumed condition changes. Compare the answers against the parts and finish you want to keep.