When should a new door be finished?

A new door and the surfaces around it may need different finish steps. Put those responsibilities in the project plan before work begins.

Find out what arrives

Ask which surfaces are already finished, primed or left for finishing. Include the frame, casing and edges as well as the broad faces. Tell the contractor if the two sides need different colours or if new trim should match an adjoining room. Keep a sample ready rather than relying on a colour name from memory.

If you are using separate people for installation and painting, ask who needs to handle the door at each stage. Agree on whether touch-ups will happen after hardware and trim are in place and who will do them.

  • Record the finish for each face, frame and casing.
  • Ask which surfaces require follow-up after installation.
  • Write down who supplies the finish and any agreed sample.

Plan around use of the opening

Ask when the door can be closed and used while the finish work proceeds. If the doorway is in daily use, plan access around the agreed sequence. Leave room in the schedule for stages the finish supplier or contractor needs to confirm.