Record the current and planned floors
Take photos of the existing transition with the door open. Tell both trades what material is planned on each side, including underlay or a transition strip if those details are known. If the new finish is not yet selected, say so. Do not assume the existing gap at the bottom will be suitable once the new floor is in.
Discuss the surrounding trim as well. Baseboards, jambs and casing may meet the floor at different points. Ask which trade will handle those joints and what information the other trade needs before starting.
- Keep the current measurement and future floor plan on separate lines.
- Show any step or lip that already affects passage.
- Tell the door contractor which flooring details are confirmed and which could still change.
Agree on the order of work
Ask when the door measurements must be confirmed and when each trade will need access. Confirm what would have to be checked again if the flooring choice or installation date changes before the door is ordered.